Working Paper No.1Renewable Energy Options for the Anglesea Mine and Power Station Site 10 November 2017 (click on link to download)
Working Paper No.2Visitor Centre Options for the Anglesea Mine and Power Station Site
(to be drafted)
SubmissionsTo support the Repower Anglesea proposal, use this
template submission to respond to DELWP's
Anglesea Futures Draft Land Use Plan before 16 March 2018
To support the Repower Anglesea proposal, use this
template submission to provide feedback to Alcoa on its
Freehold Concept Master Plan before 6 March 2018